Pre-design studies for brazilian auction
The CTE WIND Brazil is pleased to announce one more of its diverse activities in the Brazilian market of wind turbines foundations. In the auction held in August 2018, the pre-design studies conducted by CTE WIND Brasil contributed to the commercialization of two wind farm projects, located in the state of Bahia and Rio Grande do Norte, with capacity to generate 85 MW and 70 MW respectively. The studies of pre-design were of paramount importance to make the projects economically and technically viable.